LEED Regional Materials

 
LEED 2009 Materials & Resources MR5 - Regional materials (1-2 points)
 

Requirements:

  • Levels of achievement:
    • Greater than or equal to 10% based on cost is extracted, harvested or recovered & Manufactured within a 500 miles (805 Km) radius of the project (1 point)
    • Greater than or equal to 20% based on cost is extracted, harvested or recovered & Manufactured within a 500 miles (805 Km) radius of the project (2 points)
    • Greater than or equal to 40% based on cost is extracted, harvested or recovered & Manufactured within a 500 miles (805 Km) radius of the project (2 points + 1 additional innovation point)
  • If only a fraction of a product is sourced regionally then only that portion can claim to be regional
  • Mechanical, electrical and plumbing components and speciality items such as lifts shall not be included
  • Only include materials which are permanently installed in the project.
Answer:-
 
All WPIF member produced Particleboard, OSB and MDF use wood sourced in the country of manufacture.